SPRING COMMISSIONING

Haul Launch Service:

*Launch from dry storage during the week of / Per Dry Storage Agreement

*Haul from wet storage for Spring Antifouling during the week of.

Commissioning Services: Please check the service(s) you desire:

1.

Prep & paint bottom (specify color & make of paint.  Yard uses interlux if unspecified).
    Change zincs                    Check running gear

2.

Remove frame & cover.               Remove shrink wrap

3a.

Basic commissioning gas eng.(s) and generator(s).  Start up,  change fuel filters, check belts, clamps, hoses, eng. zincs & stuffing box(es).

3b.

Basic commissioning diesel eng.(s) and generator(s), Start up,  change fuel filters, bleed air from system, check belts, clamps, hoses, eng. zincs, condition of air filters, if fitted.

4 Sea Test (optional, but recommended) with basic commissioning.
    Check engine & generator performance under load, check
    for fluid leaks, check operation of trans, check for shaft
    vibration.

5. Comprehensive Commissioning - Gas eng.(s) & generators only.
    Same as #4 above, plus tune-up eng.(s) & generator(s),
    replace parts as needed, set carb mixture & idle speed, Sea
    Test Mandatory.

6. Fresh Water Systems 
    Recommission all applicable systems - purge non-toxic
    antifreeze, flush & fill with fresh water, replace water filter
    elements (if fitted).

7. Raw Water Systems  
    Recommission all applicable systems, toilets, air
    conditioner, etc., check operation, check for leaks.
 

Additional Commissioning Services:
(Please check the services you desire.)

 

Check engine alignment, adjust if needed
Check DC volt system
Check 110/120 volt system
Check battery charger    Repair if needed
Load, test & check voltage   Replace batteries if needed
Check bilge pumps, Automatic float switch
Certify fire extinguishers or halon systems    Number: 
Step mast, check wiring & lights
Check all running lights
Wash & wax hull (compounding will be add'l. cost, if needed)
Wash & wax cabin/deck (compounding will be add'l. cost, if  needed)
Varnish exterior brightwork
Clean & oil teak
Bend on sails

Any comments or special requests:

* By submitting this Work Order, I authorize, and agree to pay for, the repairs (including parts and labor) outlined in the Work Order.  I understand that a credit card authorization needs to be on file at Skipjack and that the costs of these repairs shall be charged to my credit card account.  Skipjack will not be held responsible for loss or damage to the vessel (or articles left in or with the vessel) in the case of fire, theft, accident or other causes beyond Skipjacks control.

Emergency Alerts

News

Email Address:

skipjackcove@yahoo.com

Slipholder Appreciation Day:

May 3, 2008., 12:00 - 3:00 pm
Complimentary LUNCH and a keg of beer.

Family Fun Day - July 26, 2008:

Check out a slideshow of the Skipjack Cove Family Fun Day.